9 Scope Management:
A entails managing the project's work content.
B is a subset of configuration management and as such is performed by CM specialists.
C is concerned with naming all activities performed, the end products which results and the resources consumed.
D is not a concern of the project manager.
E None of the above.
ans:C

10 Feasibility studies occur in which life cycle phase (s)?
A Conceptual
B Conceptual or Development
C Execution
D Preliminary planning
E any life cycle phase
ans:A

11 Good project objectives must be:
A General rather than specific
B Established without considering resource bounds
C Realistic and attainable
D Overly complex
E Measurable, intangible and verifiable
ans:C

12 Researching, organizing and recording pertinent information is called:
A Alternative analysis
B Information gathering
C Configuration management
D Post project analysis
E All of the above
ans:B

[1]  [2]  [3]  [4]  [5]  

温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

通关方案

  • 考试辅助
  • 高效拿证
  • 2020年6月PMP®网络直播班(清风班)

    讲师:罗福星 课时:56 价格:2888元
    全面精讲,覆盖核心考点,锁定高分助 力通关,锁定高分助力通关。
    立即报名
  • 2020年3月PMP®网络直播班(刀锋班)

    讲师:罗福星 课时:51 价格:2888 元
    全面精讲,覆盖核心考点,锁定高分助 力通关,锁定高分助力通关
    立即报名