An example of scope verification is (  ).

问题1选项
A.review the performance of an installed software module
B.managing changes to the project schedule
C.decomposing the WBS to a work package level
D.performing a benefit/cost analysis to determine if we should proceed with the project
参考答案: 查看答案 查看解析 查看视频解析 下载APP畅快刷题