2016年11月北京学位英语真题及答案

学位英语 责任编辑:胡陆 2019-07-08

摘要:学位英语真题是最好的复习资料,如果你想通过学位英语考试,那就着重做历年真题。以下是为大家整理的北京地区2016年11月份的成人本科学士学位英语真题及答案。

I. Reading Comprehension

Passage 1

If Dakota Access Pipeline (输油管道) completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3. 8 billion project hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落), is determined to stop the 1,172-mile pipeline from being built. (76) Both sides show no signs of backing down.

The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from other American Indian tribes, have traveled to the side to join the protest.

ETP says that the pipeline will have built-in measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.

American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.

(77) Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.

1. Which of the following is the main idea of the passage?

A. The Dakota Access Pipeline will create more markets for oil and gas.

B. The Dakota Access Pipeline will create many job opportunities.

C. American Indians oppose the construction of an oil pipeline.

D. American Indians fight for equal voting rights.

2. ETP hopes to finish this project in _____.

A. 2016        B. 2017       C. 2018        D. 2019

3. Why do American Indians protect against the construction of this pipeline?

A. Because it will cost up to $3.8 billion.

B. Because it threatens the region’s water supply.

C. Because it will make many people lose their jobs.

D. Because it will force many people to leave their homes.

4. According to the passage, the workers can _____ in case of pipeline leaks.

A. report to the local government            B. ask people to leave the leak affected areas

C. call 911                              D. close valves

5. According to the passage, which of the following statements is NOT TRUE?

A. This pipeline will cross four states.

B. This pipeline is 1,172 miles long.

C. All the protesters are from the Standing Rock Sioux.

D. Neither sides of the dispute is willing to compromise.

相关推荐:

全国学位英语成绩查询入口

成人学士学位英语过关技巧

希赛网为帮助参加学位英语考试的考生备考,特设培训视频教程学位英语学习包等各项助力措施,更多备考通关方案尽在希赛网学位英语考试频道。

更多资料
更多课程
更多真题
温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

学位英语备考资料免费领取

去领取

距离2021 学位英语考试

还有
  • 0
  • 0
  • 0
考试

QQ群:701601765

查分

各地不同

专注在线职业教育23年

项目管理

信息系统项目管理师

厂商认证

信息系统项目管理师

信息系统项目管理师