71、The ETL tochnology is mainly ued in (71) stage.
A. data collection
B. data storage
C. data management
D.data analysis
72、(72) is not used on perception layer of Internet of Things.
A. WLAN
B. RFID
C. Bluetooth
D.SOA
73、The (73) is a hierarchical docomposition of the total scope
of work to be carried out by the project team to accomplish the project ob jectives
and create the requirod deliverable.
A.0BS
B. WBS
C. RBS
D. RAM
74、(74) is a measure of schedule performance expreessed as the difference between the earned value and the planned value.
A. Schedule varlance (SV)
B. Cost varlance (CV)
C. Actual cost (AC)
D. Earned value (EV)
75、(75): information is not disclosed to unauthorized
indivi duals.
A. Authenticity
B. Integrity
C. Availability
D. Confidentiality
2021上半年系统集成项目管理工程师上午真题及答案解析【完整版】请大家点击下载附件查看,或-扫码-看答案,提前估分!
| 软考各科备考资源 | ||
| 资源名称 | 获取方式 | 资源链接 |
| 2026下半年软考各科考试真题汇总 | 免费下载 | 点击获取 |
| 2026年5月高项各科真题汇总 | 免费刷题 | 点击获取 |
| 2026年10月第二批集成基础知识真题 | 免费下载 | 点击获取 |
| 2026年下半年 软件设计师基础知识真题 | 免费下载 | 点击获取 |
| 2026上半年软考各科真题答案汇总 | 免费下载 | 点击获取 |
| 【历年真题】软考各科历年真题答案解析汇总 | 免费刷题 | 点击刷题 |
| 更多软考备考资料请点此查看 | ||