摘要:NormalInspection|正常检查NormalOperation|正常运行,参见OperationNormalProbabilityDistribution|正态概率分布Norming|规范正规NotApplicable|不适用(N/A)NotEarlierThan|不早于NotInventedHere|禁止意见发表(NIH)NotLaterthan|不迟于NottoExceed|不得超过(NTE)NoticeOfChange|变更

Normal Inspection|正常检查

Normal Operation|正常运行,参见 Operation

Normal Probability Distribution|正态概率分布

Norming|规范正规

Not Applicable|不适用  (N/A)

Not Earlier Than|不早于

Not Invented Here|禁止意见发表 (NIH)

Not Later than|不迟于

Not to Exceed|不得超过 (NTE)

Notice Of Change|变更通知,参见 Change Order

Notice of Termination|终止通知

Notice to Proceed|开工通知

NPV|净现值,参见 Net Present Value

NTE|不得超过,参见 Not to Exceed

O&M|运营和维护,参见 Operations and Maintenance

OAR|质量保证代表,参见 Quality Assurance Representative

Object|对象

Objective|目标

Objective Quality Evidence|客观质量证据

Objectives|目标

Object-Oriented Analysis|面向对象的分析

Obligation|义务职责债务

OBS|组织分解结构,参见 Organizational Breakdown Structure

Observation|观察观测

Observation Units|观测单位

Obsolete|过时的陈旧的

OC Curves|操作特征曲线,参见 Operating Characteristic Curves

ODC|其它直接成本,参见 Other Direct Costs

Off the Shelf Item|现货供应物品货架产品

Off the Shelf Items|现货供应物品

Offer|要约,提议,出价

Offset|抵销,参见 Resource Offset

Offsite Fabrication|非现场装配

OJT|在职培训,参见 On-the-job Training

One Hundred Percent Inspection|百分百检查

One on One|一对一会面

On-site Assembly|现场装配

On-the-job Training|在职培训  (OJT)

Open Projects|打开的项目

Operating|运作 操作

[1]  [2]  [3]  [4]  [5]  [6]  [7]  [8]  [9]  [10]  [11]  [12]  [13]  [14]  [15]  [16]  [17]  [18]  [19]  [20]  [21]  [22]  [23]  [24]  [25]  [26]  [27]  

更多资料
更多课程
更多真题
温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

PMP®备考资料免费领取

去领取

!
咨询在线老师!