2021下半年系统集成项目管理工程师上午真题及答案解析(71-75)

系统集成项目管理工程师 责任编辑:胡媛 2021-11-06

添加老师微信

备考咨询

加我微信

摘要:希赛小编在考后为大家整理了2021下半年系统集成项目管理工程师上午真题及答案解析(71-75),以方便考生估分。

为方便广大考生考后估分对答案,希赛网特向广大学员和网友搜集整理了相关真题信息,供大家参考。收集完整2021年下半年软考系统集成项目管理工程师真题后,希赛网老师也将于11月6日19:30-20:30为大家进行真题答案直播解析,考生可以点击预约

现在要推荐给大家的是文字版2021下半年软考系统集成项目管理工程师考试上午真题71-75。

71、Blocks are storage units one by oneand fach block is linkealby()in Blockchain.

A、Hash

B、DES

C、RSA

D、DSA

72、The organization shall undertake root causeanalysis and determine potential actions to preventthe occurrence or recurrence of().

A、changes

B、services

C、problems

D、incidents

73、The highest level of quality management is ().

A、detect and correct the defects before the desirables are sent头the customer as of the quality control process

B、use quality assurance to examine and correct the process it self and not just special defects

C、Incorporate quality into the ptanning and designing of the project and product

D、createa throughout the organization that is committed to quality in process and products

74、()helps to determine which individual project risks or other sources of uncertainty have the most potential impact onproject outcomes.

A、checklist analysis

B、sensitively analysis

C、decision tree analysis

D、simulation

75、In china,the security protection level of information system vs olivided into()levels.

A、3

B、4

C、5

D、6

2021下半年系统集成项目管理工程师上午真题及答案解析【完整版】将于整理后上传,届时请大家点击下载附件查看,或-扫码-看答案,提前估分!

更多资料
更多课程
更多真题
温馨提示:因考试政策、内容不断变化与调整,本网站提供的以上信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

软考备考资料免费领取

去领取